Application case of natural gas drilling in oil field 

Project Site: 
Inner Mongolia,China 
Project Genset: 
810kw Natural Gas Power Unit + 750kW Natural Gas Genset 
Project Background: 
To reduce drilling costs and pollution, our customer desired to adopt natural gas gensets to replace the original diesel gensets. 
Project Introduction: 
2 × 810kW natural gas power unit + 1 × 750Kw natural gas genset supply prime power for the mechanical drilling platform, cooling cycle system & other auxiliary production system. 

Benefit Analysis: 
It is understood that the drilling crew will consume around 160 to 180 ton diesel or 200,000 to 240,000 cubic meter natural gas for each gas well. In the local market,the price is around US$1,100 per ton for the diesel and US$0.40 per cubic meter for the natural gas.The drilling crew can save around US$96,000 to US$102,000 after the natural gas genset were adopted.