Review of existing ESP wells or design new completion and then investigation into production potential and ESP performance of existing wells, highlighting possibility of any mechanical issues, highlighting inflow performance/PI deterioration if observed, recommendation regarding ESP requirements in future, a high level Artificial Lift screening for future wells and ensuring the proposed completion is appropriately sized for the expected range of rates.
Production Allocation: Build well models and tune them to best fit match the measured historical pressure/temperature, rates and production tests in a uniform and standard manor. Use these models to predict rates (Virtual meters) automatically and alarm the engineers to take an immediate actions if the model and measured values are not within a given tolerance.